Ripe 38 Local IR WGthe Open Forum Where Policy Is Made
Agenda
Open Actions (i)
Open Actions (ii)
New Actions
38.1 Election of Chair/Co-chairs
38.2 The Form
36.5 Assignment window applied on infrastructure
38.5 Reopen policy discussion – do we need a major revision of RIPE 185
38.4 AC to coordinate Address prediction work
38.5 Implement 34.6 LIR-ALLOCATED
38.6 PI policy
36.7 Pre RIR address space
Email: webmaster@ripe.net