Ripe 38 Local IR WG the Open Forum Where Policy Is Made

2/1/01


Click here to start


Table of Contents

Ripe 38 Local IR WG the Open Forum Where Policy Is Made

Agenda

Open Actions (i)

Open Actions (ii)

New Actions

38.1 Election of Chair/Co-chairs

38.2 The Form

36.5 Assignment window applied on infrastructure

38.5 Reopen policy discussion – do we need a major revision of RIPE 185

38.4 AC to coordinate Address prediction work

38.5 Implement 34.6 LIR-ALLOCATED

38.6 PI policy

36.7 Pre RIR address space

Open Actions (i)

Open Actions (ii)

Author: Hans Petter Holen

Email: webmaster@ripe.net